WHAT IS THE LEAD TIME FOR PRODUCING AN ORDER?

Lead time for production: 20-25 days to produce 25 meters.

1. It can take more than 20-25 days if the production has busy fully in orders.
2. Orders woven in organically dyed yarn may take up 15 days longer if the desired colour is not in stock.
3. Shibori and Handblock Print additions require an additional 20 days after the weaving is complete


ARE THERE ANY ADDITIONAL SPECIAL TERMS AND CONDITIONS?

- WomenWeave woven tag are sewn on all the woven pieces, unless the client specifically requests no labels.
WomenWeave will stitch clients own labels on the product, if requested, at an additional charge per label.

- Clients must verify the weight of the shipment received, before opening the parcel. There is a chance of goods being lost or pilfered during transit. WW cannot be responsible for bearing any loss of goods during  transit.


WHAT ARE STANDARD LENGTHS OF FABRIC?

The maximum possible length of one running piece is 10 Meters


WHAT ARE WOMENWEAVE’S STANDARD YARNS FOR WEAVING?

Handspun (Khadi) organic cotton, Handspun (Khadi) conventional cotton Mill spun cotton, silks, and wools


WHAT ARE THE MINIMUM ORDER QUANTITIES?

Minimum order Quantity per style: Equivalent to 25 meters or 12 pieces or equal to 10000 INR.


WHAT ARE THE STANDARD WIDTHS OF FABRIC?

1. Standard is 48” and 36”
2. Maximum width is 58”
3. Minimum width is 15”


WHAT ARE WOMENWEAVE’S STANDARD YARNS FOR WEAVING?

1. Handspun (Khadi) organic cotton,
2. Handspun (Khadi) conventional cotton
3. Mill spun cotton, silks, and wools


WHAT DOES DOES WOMENWEAVE USE?

• 100%  Natural Organic dyes on request
• AZO free VAT chemical dyes if not otherwise specified